David Bath + Floor Text David a photo
The master bathroom before the remodel: pink tile tub deck, mint green walls, a long oak vanity with a bulb light bar and mauve carpet.

Denver · Lakewood · Littleton

Bye bye, pink & green.

David takes tired bathrooms and floors down to the studs and builds them back right. Scroll, and watch this one go.

Illustration · built from this job's real before photo

Illustration of the rough-in stage: cement board walls, bright orange waterproofing membrane over the shower and floor, new blue supply lines.

The part you never see

Most of a good bathroom is behind the tile.

Pretty finishes hide a lot. The work that decides whether a shower lasts is the stuff that gets covered up: what's done when the walls are open, how the shower is sealed before any tile goes on, and how flat the floor is before the first piece is set.

That's why David takes rooms all the way down. Once the walls are open, there's nothing left to guess about.

Real photos · this job · this week

Demo day,
for real.

No staging. These are David's photos from the master bath above, retouched for light and with the loose fixtures and floor debris cleaned out of frame.

Mid-demolition: pink tub tile partly removed and the shower wall cut open beside the old oak vanity.
01 · Tile coming off the tub deck
The bathroom gutted: walls cut open to the studs, black drain stack exposed, bare plywood subfloor.
02 · Gutted, walls open
The old shower corner opened to the studs, showing copper supply lines, a black drain stack and the floor drain.
03 · Shower corner, plumbing exposed
The same bathroom as it was listed: pink and green with an oak vanity.
00 · How the room started

What David builds.

Full-time remodeling for homeowners. Bathrooms and floors are the core of it.

  • A

    Bathroom remodels

    Full tear-outs and rebuilds. Layout, plumbing moves, vanities, tubs, lighting, paint.

  • B

    Tile showers

    Walk-in showers built from the studs out: waterproofing, niches, glass, tile walls and floors.

  • C

    Flooring

    Out with the carpet and the old vinyl. Tile, hardwood and plank floors, laid flat and finished clean.

  • D

    Demolition & prep

    Careful tear-out down to the framing, so the new room starts on a clean, honest base.

Walk the finished room

Same beam.
Whole new room.

The vaulted ceiling and the old beam stay. Everything under them is new.

  • Floating white oak vanity
  • Handmade zellige wall
  • Freestanding soaking tub
  • Frameless walk-in shower

Design rendering of this room's plan

How it starts.

  1. 01

    Text a photo

    Snap the room the way it is right now and send it with a line about what's bugging you.

  2. 02

    He comes to look

    David walks the room with you, opens the cabinet doors, checks the floor, and talks through what's possible.

  3. 03

    You get a plan

    A clear scope of what comes out, what goes in and what it costs, before anything gets torn out.

Got a pink & green
of your own?

Text David a photo of the room. Bathrooms, showers and floors for homeowners in Denver, Lakewood, Littleton and across the metro.

(720) 338-7944

Text or call · tap to call

Start a text to David

Project

Opens your messages app with this filled in. Attach a photo and hit send.